Common problems with high pole lights
The height of the high pole lamp generally refers to more than 15 meters, 40 meters below (individual special requirements are higher), the light source from several to dozens of large lighting fixtures, so the high pole lamp foundation must be scientifically designed, if necessary, special geological exploration, to ensure the safe and normal use of the high pole lamp. The following issues should be noted:
1, the safety protection of high-pole lights, here mainly refers to lightning protection and leakage protection issues, the production of high-pole lights must understand the geological conditions of the installation location of high-pole lights, reasonable design of lightning protection and leakage grounding facilities to ensure that lightning or leakage will lead the current to the ground, to ensure the safety of the people.
2, the embedded parts of the high-pole lamp, the embedded parts of the high-pole lamp in the installation of the high-pole lamp is invisible, he has irreplaceable wind support and upright high-pole lamp, must be scientifically designed according to the height of the lamp pole, maximum wind and geological conditions, and ensure a certain degree of redundancy (safety factor).
3, high pole light foundation construction problems. The main performance caused by the construction quality problem of the high pole lamp is: first, the concrete label is not enough, and the construction is not according to the standard; Second, the production and installation of the aisle pipe does not meet the requirements, and the two ends are not made according to the standard cough mouth; The third is to drag the cable on the ground when laying; Fourth, the foundation embedded pipe is not constructed according to the standard requirements, the main reason is that the embedded pipe is too thin, coupled with a certain curvature, cable wear is more difficult, and there is a “dead bend” situation at the bottom of the foundation; Fifth, the wire nose crimping and insulation winding thickness is not enough, and it will short circuit after a long time of operation.