Notes should be paying attention to the installation of intelligent high pole lights?

The installation of smart high pole lights is a process that requires careful planning and execution, and the following points need to be noted during the installation process:

 

  1. Preliminary preparation

 

Determine the installation position and height: Determine the installation position and height of the tall pole light according to the lighting requirements and the surrounding environment. The height selection should be based on actual needs, the common height of intelligent high pole lights are 15 meters, 20 meters, 25 meters, 30 meters, 40 meters and so on.

Prepare installation tools and materials: Ensure that all required tools and materials are available, including cranes, screwdrivers, wrenches, hammers, lubricating oil, bolts, steel cables, pulleys, and lamps.

  1. Foundation construction

 

Digging pits and embedded parts: according to the height of the light pole and the size of the embedded parts, dig out the appropriate size of the pit, and ensure that the pit depth reaches more than 1.5 times the length of the embedded parts. When embedding parts, ensure their levelness and verticality, and fix them with concrete.

Backfill concrete: Backfill concrete around the embedded parts to ensure that the concrete fully fills the pit and is tamped.

Three, light pole assembly

 

Light pole placement: Place the light pole flat on the ground, make sure that the bottom opening of the light pole is upward, and use the round steel pipe and the sleeper to pad it flat and straight.

Pulley, lightning rod installation: Install pulley, lightning rod and other components above the light pole to ensure firm installation. The lightning rod should be set independently, the needle length is generally half a meter, and the tip cannot be sprayed.

Lamp tray assembly: the lamp tray frame to the column, fixed with the connecting wire, and install the lamp.

Fourth, steel cable and cable installation

 

Steel cable installation: three stainless steel ropes (auxiliary steel ropes) are installed on the support frame of the fixed structure at 120°, and the three auxiliary steel ropes are connected with a stainless steel main steel rope with a connecting flange.

Cable installation: Lead the cable into the lamp pole through the roller, and tie a knot 1.2 meters after the steel rope is connected to the flange to prevent the cable from slipping off when lifting.

Five, overall lifting

 

Hoisting preparation: Use the crane to slowly lift the light pole and ensure that the bottom flange is aligned with the bolts of the embedded parts.

Fixed light pole: the upper nut is fixed to ensure the stability of the light pole.

Vi. Debugging and testing

 

Connect the power supply and control system: perform the necessary debugging to ensure that all functions are normal.

Test function: test whether the lifting function, lighting effect and various intelligent functions of the lamp panel work normally.

  1. Safety and quality requirements

 

Grounding work: Due to the height of the high pole lamp, when connecting the power cable, be sure to do a good job of grounding to prevent thunderstorms.

Insulation work: All line interfaces must do a good job of insulation work to prevent the rapid aging of the line, resulting in short circuit of the high pole light.

Anti-corrosion treatment: Check whether the black metal components of all high-pole lighting facilities (including the inner wall of the light pole) are galvanized and anti-corrosion, and whether the anti-loosening measures of fasteners meet the requirements.

Perpendicularity and straightness: Check the perpendicularity of high-pole lighting facilities, and the allowable error of the pole should be less than 3‰ of the height of the pole; The straightness error of the axis of the lamp pole should not be greater than 2‰ of the length of the lamp pole.

Lampshade and lamp support: check the mechanical strength of the lampshade to ensure the safe use of the lampshade; For closed lampshade, check its heat dissipation; Check the fastening bolts of the lamp support and adjust the projection direction of the lamp.

  1. Finishing touches

 

Clean up the site: After the installation is complete, clean up the installation site to ensure a clean environment.

Fill in records: Fill in installation records and acceptance reports for subsequent maintenance and inspection.

The above are the matters that need to be paid attention to during the installation of the intelligent high pole light, and each step needs to be operated in strict accordance with the relevant norms and standards to ensure the installation quality and safety.